"That wasn't done", "you weren't here for that many hours", "that material was already there". If you work on a time-and-materials basis, carry out repairs or charge for extras outside the quote, you will know these phrases. Almost every invoicing dispute comes from the same place: the client has no proof in front of them of what was done and what they accepted at the time. A complete work report signed by the client once the job is finished solves a good part of the problem. This article explains what it should include, when to ask for the signature and how to organise it.
Why the signature changes the conversation
An invoice without a signed report is your word against the client's. With a signed report, the conversation shifts from "whether it was done or not" to "how much what was done is worth", which is much easier to settle. In addition:
- The client checks the work while it is still in front of them and fresh in their memory, not three weeks later when they open the invoice.
- If something doesn't add up for them, it comes up there and then and is corrected on the spot.
- The office invoices with backing documentation and doesn't have to ask the operative what happened.
- If a payment ends up in a claim, you have a document showing the date, the work carried out and the client's approval.
The signature does not replace a clear quote or a contract, but it complements them: the quote says what was going to be done and the signed report says what was actually done each day. With both, the invoice stops being a surprise for the client.
What a good report needs to include
A report the client can dispute is an incomplete report. As a minimum it should include:
| Item | Why it matters |
|---|---|
| Date, client and site | Avoids confusion between jobs for the same client |
| Type of work and description | What was done, in words the client understands |
| Workers and hours, with start and finish times | This is what is disputed most in time-and-materials jobs |
| Vehicle and kilometres | Justifies the travel if it is charged for |
| Materials used | Separates what has been fitted from what was only brought to site |
| Remarks | What remains outstanding, what could not be done and why |
| Name and signature of the person accepting the work | The client's approval |
The remarks are the most neglected part and one of those that prevents the most disputes. "The tiling could not be finished because the client's material was missing", written down and signed that day, is worth far more than explaining it a month later.
When and from whom to ask for the signature
- At the end of each working day or each visit, not at the end of the job. A report per working day is easier to review than a three-week summary.
- From someone with the authority to give approval. Make it clear with the client from the start who signs: the owner, the premises manager or the maintenance manager. This can be stated in the contract or in the acceptance of the quote.
- With the completed report in front of them. Signing a blank or half-completed report is no proof and breeds distrust.
- With a copy for the client. Let them keep the report they have signed so they can compare it with the invoice.
Common mistakes with work reports
- Filling in the report in the van, from memory. Hours get rounded, materials are forgotten and the client is no longer there to sign.
- Paper reports that reach the office days later, damp, incomplete or in handwriting nobody can read.
- Mixing quoted work and extras in one report. If the extra is not kept separate, the client will see it as part of the fixed price.
- Not noting down materials that are taken to site and not used. Afterwards you don't know whether they are on site, in the van or in the warehouse.
- Not invoicing from the report. If the invoice is produced from something else, it no longer matches what the client signed.
From paper to mobile without the hassle
Moving the report to your mobile solves almost all of these mistakes, provided the tool is easier than paper for the operative. If you want them to use it, look at three things:
- It must work without a signal. In basements, industrial units and on rural sites there isn't always a network, and a report that can't be saved ends up on paper again.
- The operative should start from their job order, with the client and site already loaded, and only have to complete hours, materials and remarks.
- The client should sign on the screen and receive their copy without anyone having to scan anything.
Prepare the change with one or two crews before rolling it out, and review the first reports with them. What isn't understood in the first week is what needs simplifying.
Signed reports with Gestrab
The Gestrab app works on Android, iPhone, tablet and also on a computer, and without a signal: you can work even when there is no network and the data is synchronised when requested. Each employee receives their job orders for the day on their mobile and creates their work report from each order, with date, client, site, type, workers and hours with start and finish times, vehicle and kilometres, and the materials taken and those used. The client signs the report on the mobile, the e-signature is recorded and Gestrab emails them the signed report. You can find it at work reports from your mobile.
Each report indicates whether it should generate its delivery note for invoicing, and the automatic invoicing of pending delivery notes turns those delivery notes into an invoice. That way the invoice comes from what the client signed. More detail at certifications and invoicing.